Non-Stock: Lead time is approximately two weeks
restraining and bracing of flat bottom chord metal plate connected wood trusses spaced more than two feet on center up to 12 feet on center
It explains how some planes of a truss must be restrained/braced and provides installation guidelines
Summarizes important considerations for each phase of a project
It tells the installer to check the truss design drawing for more specific information
Long Span Jobsite Package (25 packages) B10 Summary Sheet Non-Stock: Lead time is approximatelyThe Long Span Jobsite package helps component manufacturers fulfill their duty to educate and warn customers who will be installing long span trusses (which are greater than 60' in length). Includes CWN, Cover Sheet, Information for Framers Flyer, SRR Long Span Truss Installation, SRRHIBChecklist, and BCSI Summary Sheets B1, B2, B3, B4, B6, B10, and B11. Includes English Spanish. Contains 25 packages. Sign up for electronic jobsite packages. Did